Skip to main content

Module placement

Module placement 

Source
Expand description

Phase 4: Vertical placement within columns.

Places components within each column following electrical convention:

  • VCC rail at top (5% from top)
  • Supply-connected components (plate loads) extend upward
  • Signal path on the horizontal center line (50%)
  • Ground-connected components (cathode bias) extend downward
  • GND rail at bottom (5% from bottom)

Functionsยง

place_components
Place all components and produce the initial layout.